A New Camp On it's Way

Image may be NSFW.
Clik here to view.
Some people thought we were crazy to do it but we just got back from a week at my parent’s Adirondack escape (ending last Sunday 7/11/2010).� This was Delilah’s first trip to the Adirondacks and it was a hot one.� She did great, slept a lot (it was in the 90’s with no A/C, ugh!) and smiled at her daddy a ton.

Last year we built a shed (Mostly my father, I helped a little).� This year we’re putting on an addition to the camp.� More like a new camp really… We’re taking the camp from the tiny studio-sized 336 square feet up to 960 by adding 2 bedrooms and a bigger living space.� The current camp is going to become a ‘dining’ area, kitchen and bathroom.� We’re well on our way.

Image may be NSFW.
Clik here to view.
Last week when we got to camp Dad was already all the way up to laying the floor.� It might not sound like much, but there’s a ton involved to get to that point.� Squaring everything up, leveling (& digging) the ground, insulation, wire netting, studding, joists & beams… Not simple work.� He’d been working for over a month just about steady to get to that point.� These things take time, especially when you’re by yourself in the mountains and you’re fighting the rain nonstop.

By the time we left Sunday afternoon (7 days later) we had raised all 3 of the walls (complete with OSB Board covering), All rafters were in place (save the ones that need to be placed over the existing roof) and all Zip System Roof Panels were in place and taped (as far as could be done until the remaining rafters are positioned).

Image may be NSFW.
Clik here to view.
Not bad for 5 days worth of work for 2 guys in 90+�F heat and 2 days with a bunch of help from other family.� Thanks Jerry, Scott, Donald, Wes, Pauline, Virginia, Gage & Mindy Lee!� Still lots to do, but we’re getting pretty darn close to weather-sealed.� We’re only a few steps away:

  • complete & install 1 remaining rafter
  • install Zip System Roof Panels over remaining area
  • shingles
  • small 4ft section of Wall & OSB board panels to go up adjoining existing deck
  • install a few missing OSB Board panels on the walls (mainly the gable end)
  • Tyvek Weather wrap

Of course there’s lots of little things to do as part of those steps, but those are the big ones.

If it was easy, Everybody would do it
~Harry

While it wasn’t much of a vacation for a week off… it was still enjoyable to be around some family and it made me overjoyed Rachel and Delilah were able to come up with us and be around during those ‘off’ times while we were taking a bit of a break from the beating (building) so I could hold the little one.� Oh, and a huge thanks goes out to Rachel for all the delicious meals during the week.

The place is gonna be totally unrecognizable when we get done, but it’s sure gonna be nice.� A great place for Debug to grow up.� I’m looking forward to watching her play in the stream from the new living area.

Some other photos from the process:

Image may be NSFW.
Clik here to view.